07
Power cord test report requirements, power cord test standards
How to apply for conversion power cord plug quality test report?Conversion power cord plug quality test report application agency looking for?The application for the quality inspection report is applied for by the third-party inspection agency with the testing laboratory and inspection qualification certificate in China。Poor quality of sockets, plugs and converters is a key cause of fire。The product quality problems of small sockets and plugs and converters will have a serious impact on the safety of many customers and their funds。Therefore, customers should mainly consider the safety factor of the product when purchasing sockets and plugs, converters, and switches。The plug converter means that some power cord plugs are converted into another power cord plug (such as telephone power cord plugs, USB charging power cord plugs, power cord plugs on computers, general is the role of mutual exchange of power cord plugs in various countries).。Because the use is common and it is very easy to lead to safety problems, it is necessary to apply for the inspection report of the safety factor before leaving the factory。Procedure: 1, consult customer service, confirm the inspection items and the role of the report, as well as the cost and cycle time。2, fill in the inspection application form, the relevant staff can provide PDF。3. Arrange samples (2-3 samples for testing), send the samples that must be tested by express delivery, arrange testing, and the testing department of the testing laboratory and the reporting department arrange personnel to carry out testing。4, report confirmation, first show the draft report to confirm, the information is correct after informing the customer service report, send the report, the paper version of the report is sent to the customer by Courier, PDF report is sent by mail, mobile phone QQ and other online communication methods。5, quality test report application cycle time 5-7 days, you can apply for expedited (50% expedited fee) plug converter application for inspection report standard specification: Gb/T2099.1, IEC60884-1 household and similar uses socket plugs Part 1: General requirements Gb/T2099.3, IEC60884-2-5 Household and similar uses sockets and plugs Part 2-5: Special requirements for converters standard specification plug converters rating, identification, protection from electric shock, structure, electrical performance, mechanical properties and other technical standards,Suitable for AC current, plug converters with and without protected doors, with and without fuses。Plug converter application for quality test report item: 1.Inspection of marks and dimensions;2.Protection against electric shock, grounding measures;3.The structure of the terminal and the end and the fixed socket;4.Power cord plug and mobile socket structure, interlock socket;5.Aging resistance, protection provided by the housing and moisture resistance;6.Insulation resistance and electrical strength, grounding contact work;7.Temperature rise, breaking capacity, normal operation method, force required to unplug the power cord;8.Flexible cable and connection, mechanical strength, heat resistance;9.Screws, current-carrying parts and connections;10.Creepage distance, electrical clearance and distance through the sealant;11.Insulation layer material resistance to abnormal heat, fire resistance and resistance to electrical marking;12.Additional tests on rust resistance, latch with insulating sheath。以上就是gpk电子游戏官网小编orange,为大家分享的关于CE certification is what certification, what is the standard的相关知识,相信大家对此已经有了基本的了解,关于专业方面的问题,有任何疑问都可以联系下方专业人士为您解答,希望对大家有所帮助。Contact us: Lanya Technology Services (Shenzhen) Co., Ltd. is the national CNAS, China Metrology Certification CMA, American Laboratory Accreditation Association A2LA, Wireless Charging Alliance WPC, Bluetooth Certification Evaluation Committee SIG, Amazon Amazon等国际机构的认可实...